Projects

 

 

VH-HRS Bell 412 rewire 2001

  • Aircraft stripped to a shell. All kapton wiring and components removed. Interior repair and repaint

  • Full rewire - Electrical, Instruments & Radio systems

  • 140 systems interconnected

  • Avionics systems and wiring standards exceeded
    Manufacturer's Approved standard

  • This project was reportedly the first full rewire of a Bell 412 to be completed in Australia

VH-HRS Bell 412 rewire 2001

  • Inside the nose of the Bell 412

  • 14,000 metres of laser marked wire prepared and installed

  • 8,000 connections

VH-HRS Bell 412 rewire 2001

  • Pitot/static system upgrade for ease of testing and changeover of instruments - use of chambers allowed simple interconnection of pitot/static lines - a cleaner install

  • Wiring looms were re-routed with consideration of future maintenance

  • Keeping them clean, tidy, properly marked and well ordered for future access

VH-CWP Major Fitout

  • Triple Audio Panel installation

  • Access/A Patch Panel - NAT audio panels

  • 8 Coms including HF, SkyConnect and Transceivers


Fire Service Aircraft (various)

  • A number of rotary and fixed wing aircraft were fitted out for Fire Service 2002 - 2004

  • One major project, VH-KSV, logged 600 hours directly after the rewire - due to RFS's preference for use of this aircraft which was directly attributed to it's superior avionics fitout

  • The Labour cost of electrical and avionics rewire and installs - approx $50,000 - was easily recouped within a week of flying service for the Rural Fire Service

        


VH-EMZ Bell 412 Fitout

  • Completed January 2008

  • Old kapton wiring removed and rewired. Avionics systems

  • 4 Audio Panels installed with Access/A Patch Panel - Nat Audio Panels

  • 8 Coms

  • Upgrade of Avionics & repair of old wiring


VH-EMZ Bell 412 Fitout

  • Looking inside the nose - neat and clean

  • Major repairs to electrical system wiring due to age of aircraft

  • Hoist, Nightsun, MFD and Weather Radar, & EMS systems installed

  • SkyConnect Satphone with Tracking

VH-EMZ Bell 412 Fitout

  • All lit panels refurbished

  • Additional avionics installed

  • Pedestal wiring repaired

  • RDR2000 Radar & MFD (Multi-Function Display) installed

VH-EMZ Bell 412 Fitout

  • View of the roof panels in EMZ

  • All lit panels refurbished

VH-WYR R44 Traffic Chopper

  • Major engine failure in one aircraft caused the urgent transfer of specialised equipment to a replacement helicopter

  • Geneva Audio System

  • News Downlink System

  • Tight timelines to ensure traffic reporting contracts were met

Robinson R22 & R44 (various)

Fitout of various new aircraft with:

  • Audio systems

  • Com systems

  • Altitude systems (Radar Altimeter)

  • Entertainment systems
 

VH-LSY / LSV  Bell 412

  • Major wiring repairs - kapton removed
  • Nightsun, MFD, Radar, and Hoist systems installed.
  • Prepared for Military support

VH-SLS Eurocopter BK117

  • Completed August 2008.
  • Included Sky Connect system and major overhaul of existing avionics... etc.
  • Major wiring repairs and re-marking carried out
  • Installation drawings updated for ease of future reference and system upgrades.

Before Project Commences:

HUGHES 500 D/E and H530

  • Redesign and full re-wiring for Fire Service and Avionics upgrade

  • Laser marked wiring kits prepared and installed

  • Drawings drafted on A3 Autocad for a complete and accurate record of installation

On completion:

Looms are tidy and wiring locations are easy to follow


AGUSTA 109 Aircraft

  • Experienced Agusta 109 engineers for modifications and scheduled maintenance
  • Agusta 109 Avionics upgrades and refurbishments
  • The Agusta distributor, Heliflite Pty Ltd, is located right opposite the RAA workshop and can provide any other Agusta support needed

 

VH-CKC 

  • News helicopter installations and upgrades
  • Dual audio panel install and integration to Downlink system